The face lift and tummy tuck of the Historic Hernando School is well underway.
It was surprising to see most of the worn and gristly carpet was already removed and gone.
This exposes the wood floor. Although a few spots will need extra love, the major project of refinishing the wood to it’s natural beauty should prove to be a worthwhile project. Financial support for the wood floor refinishing and the overall project remains a major consideration.
Many of the walls also need to be patched. It was encouraging to see that the majority of the bad spots in the entire building are already on the way to being repaired. Wood has been installed on the walls to patch these spots, felt paper over most of them. There remains placement of wire lathe and plaster. That will open the door for paint.
Pictures and video updates of the project will continue to available here.

It is Happening!
by
Tags: